Jarvie Plant
Call us on 0345 208 4444
Select your local branch to call
0345 208 4444
0141 445 2121
0131 453 5311
01383 514444
01294 212121
0141 887 0044
01382 270 101
01224 510 101
Inverness (Nairn)
01463 572090
0161 302 7030
Close [X]
Go Back

Construction Case Studies

Kelvin Hall Refurb

Refurbishment In Glasgow

Our client are undertaking a re-roofing project. There was a need to keep costs down and productivity up. Proximity to members of the public and the roads around the venue was also a concern. Read Case Study

Riverside Transport Museum

We had supplied an 25m MRT2540 Rotating Telescopic Handler with a PT800 Jib and Winch which was being used with a Cladboy vacuum system for the installation of cladding. However, this was not big enough to reach the final part and the load bearing capacity of the surrounding paving would not allow access for a crane. Read Case Study

New School

We were asked to visit the site for a new school to advise on a Telescopic handler issue. On arrival we found that the customer had to place 2t precast concrete blocks vertically under overhangs and with no clearance below. Their current machine didn’t have an attachment that was suitable. Read Case Study